Marine vessel at sea

Build Ships.
Powered by data

⚙️

500+

Tasks Managed Daily

📦

Real-time

Inventory Tracking

⚡

30%

Faster Production Cycles

Phase 01Design & Engineering

From Blueprint to Build Plan

Digitize your vessel design process. Structure your bill of materials, assign engineering teams, and build production timelines — all before the first steel plate is cut.

📐

CAD Design Integration

Import DWG/DXF files and link components directly to your BOM.

📋

BOM Structuring

Organize all 10,000+ parts by phase, assembly, and supplier.

📅

Timeline Planning

Gantt-style scheduler with critical-path dependency tracking.

Techno Marine — Projects
New Project Dashboard
Why Techno Marine

BUILT FOR THE SHIPBUILDING INDUSTRY

Generic ERP tools aren't designed for marine manufacturing. We are.

Marine-native

Industry-Specific Workflows

Pre-built templates for hull assembly, engine installation, and marine-grade quality inspections.

Auto-sync

Integrated Inventory + Production

Material usage automatically syncs with procurement — no manual tracking, no stockouts.

Live updates

Real-Time Production Visibility

Live dashboards show every task, worker, and material across your entire shipyard floor.

Enterprise-ready

Scalable for Any Yard Size

From boutique boat builders to large commercial shipyards — the platform grows with you.

SMART INVENTORY, ZERO SURPRISES

Never halt production over a missing part again. Track every material in real-time, get automated low-stock alerts, and generate purchase orders in one click.

Marine vessel at sea
📦

Smart Inventory Tracking

Every material tagged, located, and linked to a production phase.

🤖

Auto Procurement Rules

Set reorder thresholds — the system creates POs automatically when stock dips.

🔄

Supplier Integration

Connect with 200+ marine suppliers for instant price and availability checks.

Techno Marine — Inventory Dashboard
Live
Inventory Dashboard
Phase 03Production Floor

Every Task, Every
Worker — Tracked

Assign tasks, track progress, and manage your entire production workforce from one command center.

Techno Marine — Procurement Management
Live
Procurement Management Dashboard
Luxury yacht at sunset

HAND OVER WITH
COMPLETE CONFIDENCE

Every document, certificate, and test report in one organized digital handover package — ready for the owner and classification society.

Live Platform Preview

One Platform. Complete Control.

Everything you need to run a modern shipyard — production, inventory, workforce, and analytics in one unified workspace.

Techno Marine — Project Overview
Live Data
Project Overview Dashboard
Request Live Demo →

No commitment required • 30-minute session • Personalized walkthrough

Results ThatMove The Needle

Shipyards using Techno Marine report measurable improvements within the first quarter of deployment.

Marine vessel
📉

Reduce Production Delays

30% Faster Cycles

Automated task scheduling and real-time alerts eliminate the bottlenecks that cause costly overruns.

🧠

Improve Resource Planning

25% Efficiency Gain

Intelligent workforce allocation ensures the right person is on the right job at the right time.

📦

Eliminate Inventory Loss

15% Cost Reduction

Perpetual inventory tracking and auto-reorder prevents material shortages and over-purchasing.

👥

Increase Workforce Output

40% Less Downtime

Digital task assignments and mobile check-ins keep every worker productive — fewer idle hours.

Up & Running in 6-8 Weeks

A structured implementation designed for maritime operations — not a generic software rollout.

🔍

01

1 week

Understand Your Workflow

Our marine industry experts spend time at your yard, mapping every production stage, team structure, and pain point.

⚙️

02

2–3 weeks

Customize Your Modules

We configure the platform specifically for your vessel types, team hierarchy, and classification society requirements.

🚀

03

2 weeks

Deploy & Train Your Team

Hands-on onboarding for production managers, foremen, and workers — with role-specific training materials.

🏆

04

1 week

Go Live with Confidence

Dedicated support during your first live project, with a Customer Success Manager always on call.

“
We engineered Techno Marine after witnessing the operational friction on shipyard floors firsthand—manual reporting, disjointed communications, and costly project delays. We built this platform from the ground up to translate shipyard complexity into seamless, data-driven execution.
SR

Sri Raksha

Co Founder, Techno Marine

“We didn't adapt a generic manufacturing tool. We built shipbuilding software from day one — for the people who actually build ships.”

See Techno Marine In Action

Book a live demo with our team. We'll show you how it works with your workflow.

No commitment required
Personalized for your workflow
30-minute session

Or reach us directly

Techno Marine Logo
Techno Marine

© 2026 Techno Marine. Marine Manufacturing Software.